Skip to main content
Compendium · Atoms · Maturity & Process

Maturity & Process

Items
68
of 1002 total

Atomic primitives in the maturity & process family. Click any tile for the live render, the spec it was built from, and the code that fell out.

Indicators · 17
#026 de
// stage 2 / 4
  1. 2
  2. 3
  3. 4
Collaborative Growing team

Stage Indicator

STA
indicators · card · real-content · dark-mode-tested
#027 de
// ladder stage 2
  1. 4 Autonomous
    Agent systems
  2. 3 Orchestrated
    Multi-team AI
  3. 2 Collaborative
    Shipping team
  4. Augmented
    Spec-first start

Maturity Ladder

STA
indicators · list · real-content · dark-mode-tested
#031 de
// pulse live
cycleCYCLE-042
elapsed04D 11H
rate / d38

Cycle Tick

STA
indicators · svg · animated · reduced-motion
#441 de
// stage pip
stage
2/4
inline · header strip · ticket margin

Stage Pip

STA
indicators · badge · real-content · dark-mode-tested
#442 go
// autonomy rung 3/4
  1. Augmented
    human drives
  2. Supervised
    review each
  3. 3 Bounded
    scoped autonomy
  4. 4 Strategic
    agent-led

Autonomy Rung Indicator

STA
indicators · list · real-content · dark-mode-tested
#443 de
// practices adopted 11/16
68%
remaining 5 practices

Practice Adoption Bar

STA
indicators · gauge · real-content · dark-mode-tested
#444 de
// cadence · 14 beats 86%
  1. ×
  2. ×
hits12
missed2
streak5

Process Cadence Pulse

STA
indicators · chart · real-content · dark-mode-tested
#445 de
// SPEC-038 · lifecycle 4/5
  1. DRAFTED
  2. APPROVED
  3. BUILT
  4. OPERATING
  5. RETIRED
OPERATING day 87 in phase

Lifecycle Progress Strip

STA
indicators · timeline · real-content · dark-mode-tested
#446 go

// audit cycle 12 · scorecard

  • spec coverage ··· 88%
  • drift handled ··· 92%
  • ceremony hit ··· 76%
  • autonomy rung ·· supervised
B
grade · 2026-05-21

Maturity Grade Stamp

STA
indicators · stamp · real-content · dark-mode-tested
#447 go
// baseline est.
2026 03-04
practice
INTENT-REVIEW
since · 78 days
baseline · 2026-03-04 · origin of audit clock

Baseline Marker

STA
indicators · badge · real-content · dark-mode-tested
#448 go

// metric · ICS-threshold

Threshold last calibrated when team size was 6 and cycle was weekly. Both have since changed. Drift in the ground truth.

last calibrated → 2026-02-12

CALIBRATION DUE
overdue · 23d

Calibration Due Stamp

STA
indicators · stamp · real-content · dark-mode-tested
#449 de
// process tier SPEC-038
STANDARD tier · gating profile
ceremonies5
gates3
approvers2

Process Tier Chip

STA
indicators · badge · real-content · dark-mode-tested
#450 de
// team size 3/5
MEDIUM · 6-15
  1. SOLO
  2. SMALL
  3. MEDIUM
  4. LARGE
  5. ENTERPRISE

Team Size Bracket Chip

STA
indicators · badge · real-content · dark-mode-tested
#451 de
// cadence retro
WEEKLY 52 per yr
  1. DAILY
  2. WEEKLY
  3. BIWEEKLY
  4. MONTHLY
  5. QUARTERLY

Cadence Frequency Pip

STA
indicators · badge · real-content · dark-mode-tested
#452 de
// trigger mode retro
SIGNAL
driven
CALENDAR
fixed
when
drift > 5 / week
last fired 4 days ago

Signal Driven Indicator

STA
indicators · card · real-content · dark-mode-tested
#453 go
// gate · step 3 of 5 SPEC-038
! CEREMONY REQUIRED
ceremony
INTENT-REVIEW
attendees3
est. duration45 min

Ceremony Needed Flag

STA
indicators · banner · real-content · dark-mode-tested
#454 de
// radar spoke 3/4
3 stage GOVERNANCE

Process Maturity Radar Spoke

STA
indicators · svg · chart · real-content
Reviews & Logs · 17
#028 de
// AAR · CYCLE-042 2026-05-19
Shipped 2
  • SPEC-014 ICS scorer v2
  • SPEC-021 threat validator
Slipped 1
  • SPEC-019 GTR dashboard (carry)
Learned

Threat templates need worked examples before they bind reviewers.

AAR Card

STA
reviews-and-logs · card · list · real-content
#029 de
// GTR · last 20 cycles now →
met 15
deg 3
miss 2

GTR Tracker

STA
reviews-and-logs · chart · real-content · dark-mode-tested
#035 de
DOCODEGO
cycle-042 // 2026-05-19
  • 08:02 SPEC @author SPEC-014 opened
  • 09:17 COMP @claude compose pr#218
  • 10:41 VAL+ @platform AC 7/7 green
  • 11:03 GOV @gatekeep gate approved
  • 11:08 SHIP @cd v0.4.0 deployed
  • 11:09 AAR @team cycle logged
TOTAL EVENTS 6
// thank you for converging

Process Receipt

STA
reviews-and-logs · list · real-content · dark-mode-tested
#461 de
CYCLE-042 2026-05-19 CONVERGED

Threat templates need worked examples before they bind reviewers.

aar row @author

AAR Row

STA
reviews-and-logs · list · real-content · dark-mode-tested
#462 go
2026-05-21 09:14 ICS-LATENCY
142ms / 90ms @governor

GTR Event Row

STA
reviews-and-logs · list · real-content · dark-mode-tested
#463 go
// intent review · signal-driven
AC pass-rate fell below 80%
SPEC-038
94% 71% AC pass-rate
not scheduled · signal-driven @governor

Intent Review Card

STA
reviews-and-logs · card · real-content · dark-mode-tested
#464 go
R3 spec grilling REVISE

AC #4 conflates rate-limit with quota. Split or collapse?

@gatekeeper spawned: 1

Spec Grilling Round Row

STA
reviews-and-logs · list · real-content · dark-mode-tested
#465 go
PLAN-014 APPROVED
  • feature-flagged at 10% rollout
  • GTR breaker armed at 95% AC pass
@governor 2026-05-21 10:48

Plan Approval Record Card

STA
reviews-and-logs · card · real-content · dark-mode-tested
#466 go

REVIEW-118 / SPEC-038

AC #4 conflates rate-limit with quota. Split into two acceptance criteria, or fold quota into a constraint. Either route is fine — pick one and resubmit.

REVISE
@gatekeeper · 2026-05-21

Review Decision Stamp

STA
reviews-and-logs · stamp · real-content · dark-mode-tested
#467 go
// review · attendees
@author @governor @gatekeeper

roles, not people

Review Attendee Chip

STA
reviews-and-logs · badge · real-content · dark-mode-tested
#468 de
DOING due CYCLE-043 @author

Split AC #4 into rate-limit + quota acceptance criteria

Review Action Item Row

STA
reviews-and-logs · list · real-content · dark-mode-tested
#469 de
11:03:14 GOV gate approved · plan-014 enters staging at 10% rollout

Log Entry Line

STA
reviews-and-logs · list · real-content · dark-mode-tested
#470 go
// audit · last 24 events
oldest newest

Audit Event Pip

STA
reviews-and-logs · badge · real-content · dark-mode-tested
#471 go
// signals since last review WARM
7 / 10 signals

not a calendar · pressure-driven

Review Cadence Meter

STA
reviews-and-logs · gauge · real-content · dark-mode-tested
#472 go
// anomaly · review opened
p95 LATENCY
observed
312ms
expected
60–140ms

Re-grill SPEC-038; consider rate-limit tightening.

@governor not a regression · yet

Anomaly Review Card

STA
reviews-and-logs · card · real-content · dark-mode-tested
#473 de
// review-118 · summary APPROVED
events
24
actions
5
follow-ups
2

Review Summary Strip

STA
reviews-and-logs · banner · real-content · dark-mode-tested
#474 de
// retro · vote 3/4
@author
@governor
@gatekeeper
@author

Retrospective Vote Pip

STA
reviews-and-logs · badge · real-content · dark-mode-tested
Instruments · 17
#032 de
// velocity gen rate
0 5 10 15 20 14 specs / day

Velocity Meter

STA
instruments · svg · gauge · animated
#033 de
// validation lag −8
0 5 10 15 20 6 validated / day

Validation Meter

STA
instruments · svg · gauge · animated
#034 de

Milestone Stamp

STA
instruments · stamp · real-content · dark-mode-tested
#481 de
// spec throughput DO rate
0 5 10 15 20 11 specs / day

Spec Throughput Meter

STA
instruments · svg · gauge · animated
#482 de
// composition CO rate
0 5 10 15 20 17 units / day

Composition Throughput Meter

STA
instruments · svg · gauge · animated
#483 de
72% target 80%
coverage WATCH

Validation Coverage Meter

STA
instruments · svg · gauge · animated
#484 de
17/24 71% demonstrated
demos IN PROGRESS

Demonstration Completion Meter

STA
instruments · svg · gauge · animated
#485 go
// governance GO rate
0 4 8 12 16 9 actions / wk

Governance Action Meter

STA
instruments · svg · gauge · animated
#486 go
84% target 90%
AAR DRIFTING

Alignment Rate Gauge

STA
instruments · svg · gauge · animated
#487 go
9h target 8h
DDL OVERDUE

Drift Detection Latency Meter

STA
instruments · svg · gauge · animated
#488 go
plan approval latency OVERDUE
0h target 8h 16h+
14h

Plan Approval Latency Bar

STA
instruments · chart · real-content · dark-mode-tested
#489 go
// spec revisions
spec SPEC-042

Spec Revision Counter

STA
instruments · real-content · dark-mode-tested · responsive
#490 go
// grilling rounds 3 / 5
round 3 in progress

Spec Grilling Round Counter

STA
instruments · real-content · dark-mode-tested · responsive
#491 de

Milestone Completion Stamp

STA
instruments · stamp · real-content · dark-mode-tested
#492 go
// baseline pin specs / day
0 5 10 15 20
14 baseline

Instrument Baseline Pin

STA
instruments · svg · real-content · dark-mode-tested
#493 go
// threshold band legend
0 to 8 8 to 16 16+
metric plan approval latency (hours)

Instrument Threshold Band

STA
instruments · real-content · dark-mode-tested · responsive
#494 de
// needle 64%

Instrument Needle

STA
instruments · svg · animated · reduced-motion
Flow · 17
#030 de
// continuous loop no timebox
SPEC
COMPOSE
VALIDATE
SHIP
LEARN

Sprint Replacement Loop

STA
flow · svg · animated · reduced-motion
#501 de

// trigger pip

on: spec.merged

Step arms when the upstream signal fires. No clock, no standup.

Signal-Driven Trigger Pip

STA
flow · badge · real-content · dark-mode-tested
#502 de

CARD-118 / SPEC-044

Compose stage emitting tokens, validator subscribed, ship signal idle. Card moves the moment validate.passed publishes.

FLOW
continuous · signal-driven

Flow State Stamp

STA
flow · stamp · real-content · dark-mode-tested
#503 go

CARD-091 / waiting

Awaiting threat-review.signed from governance. Upstream queue depth 2. No work in progress on this card since the signal arms.

BLOCKED
signal unmet

Blocked State Stamp

STA
flow · stamp · real-content · dark-mode-tested
#504 de

// step status

waiting on validate.passed

The step is subscribed; arrival of the named signal advances flow.

Waiting-On-Signal Chip

STA
flow · badge · animated · reduced-motion
#505 de
COMPOSE emits: artefact VALIDATE
handoff contract · named emission

Handoff Arrow (Flow)

STA
flow · svg · navigation · real-content
#506 de
continuous convergence
SYSTEM HEARTBEAT

Continuous Convergence Pulse

STA
flow · animated · reduced-motion · real-content
#507 de
// pull backlog READY · 4
SPEC-044
session-ttl-revision
ready: threat-review.passed

Backlog Pull Row

STA
flow · list · real-content · dark-mode-tested
#508 de

// lane: compose-on-demand

JIT idle idle

Lane stays cold until demand pulls. The notch fires the trigger; the arrow shows direction of pull.

Just-In-Time Trigger Marker

STA
flow · svg · real-content · dark-mode-tested
#509 de

// assignment model

PULL
PUSH

Pull is the framework default. Push remains available for legacy lanes; teams should audit any push-mode work monthly.

Pull vs Push Toggle

STA
flow · form-control · real-content · dark-mode-tested
#510 de
// cadence trailing 7d
flow events closed
SIGNAL-DRIVEN
47

Flow Cadence Counter

STA
flow · real-content · dark-mode-tested · responsive
#511 go
// impediment
review-queue-depth
HIGH cards affected: 6

Flow Impediment Flag

STA
flow · badge · real-content · dark-mode-tested
#512 go
flow debt OVER
0 budget 12 14

Flow Debt Bar

STA
flow · chart · real-content · dark-mode-tested
#513 de
38h target 48h
CYCLE ON-TARGET

Flow Cycle Time Meter

STA
flow · svg · gauge · real-content
#514 go

// lane: validate

WIP 3 /4

SATURATING

Pulls into this lane pause once current reaches the limit. The cap forces closure before opening.

WIP Limit Chip

STA
flow · badge · real-content · dark-mode-tested
#515 de

CARD-074 / SPEC-039

Cycle began on pull at 09:12, validate.passed published at 18:47. Unit moved through five stations without re-entry.

FLOW CLOSED
on validate.passed

Flow Completion Stamp

STA
flow · stamp · real-content · dark-mode-tested
#516 go

// rebalance

COMPOSE shift 2 VALIDATE

capacity rebalance · governance act

Flow Rebalance Arrow

STA
flow · svg · navigation · real-content
Alpha · Honest about it

The framework is real.
The community is forming now.

DoCoDeGo is in Alpha. The framework is documented, the practices are battle-tested at small scale, and the next release is being shaped in public.

If it produces anything, it should produce engineers and teams who think more clearly about what they are building and why.

Two doors in
Join the Discord

Discord is where specs are debated, the framework gets sharper, and decisions land in writing. The conversation is the artefact.